in

Abbreviations Used in Quantity Surveying

Quantity surveyors often use standard abbreviations when preparing a bill of quantity, take off or construction specification. It is essential for the student has a knowledge of these abbreviations. The following abbreviations have been used by quantity surveyor so you should familiarise with these terms. Also, check out Commonly used abbreviations in construction industry and civil engineering.

Common Abbreviations in Quantity Surveying

Ìý²¹.²ú.   as before
a.b.d.  as before described
a.b.s.  as before specified
a.m.e.  bill, measure and extend
Ìý²ú.¾±.  build in
Ìý°ä³¢  centre line
Ìý³¦.±è.  chromium plated
Ìý³¦³Ù²õ Ìý³¦±ð²Ô³Ù°ù±ð²õ
Ìý»å»å³Ù Ìý»å±ð»å³Ü³¦³Ù
Ìý»å±ð²õ³¦»å. Ìý»å±ð²õ³¦°ù¾±²ú±ð»å
Ìý»å¾±²¹. Ìý»å¾±²¹³¾±ð³Ù±ð°ù
Ìý»å¾±³¾./»å¾±³¾²õ»å. Ìý»å¾±³¾±ð²Ô²õ¾±´Ç²Ô±ð»å
Ìý»å¾±²õ³Ù. Ìý»å¾±²õ³Ù²¹²Ô³¦±ð
Ìý»å¾±³Ù³Ù´Ç./»å´Ç.  as before
Ìý»å.±è.³¦.  damp proof course
Ìý»å°ù²µ./»å·É²µ. drawing




Ìý±ð²¹. Ìý±ð²¹³¦³ó
Ìý·¡.´Ç. Ìý±ð³ætra over
Ìý±ð³æ Ìý±ð³ætra/out of
Ìý´Ú/³¦  final cost
Ìý¹ó.¹ó.³¢.  finished floor level
Ìý¹ó.³¢.  floor level
Ìý´Ú.²õ.  finished size
Ìý´Ú³Ù²µ²õ Ìý´Ú´Ç´Ç³Ù¾±²Ô²µ²õ
Ìý²µ²¹±ô±¹»å Ìý²µ²¹±ô±¹²¹²Ô¾±²õ±ð»å
Ìý³Ò.¹ó.´¡.  gross floor area
Ìý³Ò.³¢.  ground level
Ìý³Ò±Ê°¿  general purpose outlet
Ìý±á¶Ù±«±Ê³Õ°ä  heavy duty unplasticised polyvinyl chloride
Ìý±á·¡  fitment hook end allowance
Ìý±õ.³¢  invert level
  in-situ  in position
Ìý°¿.°Õ.¸é.  other than rock
Ìý±Ê.°ä.  prime cost
Ìý±Ê.°ä.A.  plumb cut allowance
Ìý±è.±¹.²¹.  polyvinyl acetate
Ìý±è.±¹.³¦.  polyvinyl chloride
Ìý°ù±ð²ú²¹°ù  bar reinforcement
Ìý¸é.³¢.  reduced level
Ìý¸é.°¿.´Ü.°ä.  red oxide zinc chromate
Ìý³§²Ñ²Ñ  Standard Method of Measurement
Ìý²õ±è±ð³¦´Ú²Ô Ìý²õ±è±ð³¦¾±´Ú¾±³¦²¹³Ù¾±´Ç²Ô
Ìý³Ù.³¦. Ìý³Ù±ð°ù°ù²¹³¦³Ù¾±´Ç²Ô
 T & G  tongue and groove
Ìý±«±Ê³Õ°ä  unplasticised polyvinyl chloride
Ìý±¹.³¦.  vitrified clay
Ìý·É. Ìý·É¾±³Ù³ó
xtg. existing

Commonly Used Abbreviation in 188betÍøÒ³°æ Industry

AutoCAD Plans Collection – Autocad Drawings of Buildings Free Download